HALF THE DRYING TIME…
Because the mat focuses the heated air where it is needed most the drying time, and overall energy consumption, is significantly reduced. The drying time for a saturated solid concrete slab can be reduced from 6-8 weeks using dehumidification and air movement to as little as 1-2 weeks using targeted heat drying.